For the last 3 months been paperwork at home and visiting site fairly regularly.
Really getting pissed off doing 'As Builts' and final filing. So been working part time and visiting my 'local' at lunch time. Every working day! Basically, we have been delayed on phase 2 and I'm trying to spead the time so to speal.
But today was different. Yes, today I went to 'local', then home for shower prior Chiropractor (my back). Have to have XRays on Tuesday (booked).
Walking back home, called into offy for a bottle of FG when I got a call!!!!!!!
Client needs all paperwork. Client needs me to take 1-3 month 'holiday'!!!!!!!! before phase 2 and aint got any work or 'funds' to pay me for time away. Being a contractor, I have no option.
They have 7 big jobs and every one has been delayed.
They do this at their risk though. Once I sign a 3-6 contract, I will not terminate early as I do not 'Burn Bridges'.
Am I Right or Wrong in that?
But what the F***, I am enjoying life.